Jupiter Series ® Single, Two-stage & drainable louvres

Ideal for commercial buildings or in applications where both performance & aesthetics are necessary.

Louvreclad’s Jupiter Series® louvres feature an extruded aluminium fixed louvre which is ideal for commercial and industrial applications.  The Jupiter Series® has a host of options which include fixed, single, two-stage or drainable louvres.

The Jupiter Series® Standard Louvre:

Ideal for commercial buildings or in applications where high quality general louvres are required. It is suitable for general purpose plant room louvres, air intake louvres, exhaust louvres and and plant deck louvres.

The Jupiter Series® Drainable louvre:

Offers an exceptional drainable performance in horizontal external louvres. Providing you with outstanding water penetration performance and available in a horizontal external louvre system.

This is primarily achieved by draining the water from each blade and discharging it at the bottom of the louvre through vertical down pipes found at either side of the louvre. Each blade has its own drainable catchment gutter which prevents a cascading effect of water down the face of the louvres. This provides excellent water draining performance and guarantees its effectiveness in providing less penetration at any given performance level.

The Jupiter Series® Two-stage:

The Jupiter 2 Stage achieves an A3 Performance Classification in accordance AS/NZS 4740:2000 making it one of the highest performing louvres on the market for both rain defence and aerodynamics. Also known as a double bank louvre, the double interlocking effect provides 100% effective rain defence while also ensuring optimal airflow even in adverse weather conditions. Designed for zero vision, the Jupiter Series® two-stage louvre is manufactured to withstand cyclone conditions and intense weather conditions.

Distinctive Features + Diverse Applications + Multitude of Benefits:

  • Can be specified in modular panels or as a continuous application
  • For a seamless, uninterrupted façade
  • Ideal for inverted louvre situations (eg plant screens)

Attention to Detail:

  • 55% free open area
  • Maximum blade span: 1500mm
  • Maximum blade length: 6500mm
  • Designed, engineered and certified for incidental live load.

Related Projects:

Harold Park Precinct – Forest Lodge NSW

The Ponds Shopping Centre – The Ponds NSW

Energex Headquarters – Newstead

Early Contractor Involvement

Early Contractor Involvement (ECI) can save money, save time and ensure the best outcome.

Get in touch with one of our experts at design stage and ensure the success of your project.  Whether it is a highly bespoke & complex brief that requires testing & prototyping or a simple design needing clarification around detailing, to achieve a high-end premium finish, attention-to-detail is essential.

  • ProductQty 
    Add a new row